Environmental Enforcement at Ontario Graphite Mine

The Ontario Ministry of the Environment, Conservation, and Parks recently issued an amended Order to Ontario Graphite Ltd. (OGL), a mining company operating in Kearney. The Order requires the following actions:

  1. The implementation of a long term water level monitoring program of the wastewater treatment works.
  2. The construction of a polishing pond system to treat industrial wastewater generated from the mining operation.
  3. The construction of a stormwater trench and groundwater collection system.

The company is appealing the latest Order from the Environment Ministry.

Ontario Graphite Mine, Kearney, Ontario (Photo Credit: NorthBayNipissing.com)

The OGL mining operation is located in Kearney, Ontario. The town is situated in the Almaguin Highlands region of Parry Sound District of Ontario, Canada.  With a landmass of 531 square kilometres and a year-round population of 882 in the Canada 2016 Census, Kearney claims to be the “Biggest Little Town in Ontario.”  Butt Township was amalgamated with the Town of Kearney in 1979.

The Order is a the latest in a number Orders issued against OGL. In 2018, the Ontario Environment Ministry issued an Emergency Director’s Order to Ontario Graphite Ltd. (OGL) related to its mining site in Butt Township, Kearney, Ontario.  An Emergency Director’s Order is issued when the Environment Ministry is of the opinion that inaction of a situation can result in one or more of the following: danger to the health or safety of any person; harm or serious risk of harm to the environment; or injury or damage or serious risk of injury or damage to any property.

Under the 2018 Emergency Order, OGL was required to take immediate actions to protect the natural environment and to prevent or reduce the discharge of a contaminant into the natural environment from the undertaking or property, or to prevent, decrease or eliminate an adverse effect.

OGL is a privately owned Canadian mining company is in the process of re-commissioning and operating the Kearney Graphite Mine, one of the largest confirmed graphite mineral resource projects in North America and among the largest individual deposits in the world. OGL estimates that there are sufficient graphite reserves at the site to maintain mining operations for over 30 years.

Graphite is a crystalline form a carbon. It occurs naturally in this form and is the most stable form of carbon under standard conditions. Graphite is used in pencils and lubricants.

Ontario Graphite Ltd. Subject to Control Order Issued by Environment Ministry

The Ontario Ministry of the Environment and Climate Change (MOECC) recently issued an Emergency Director’s Order to Ontario Graphite Ltd. (OGL) related to its mining site in Butt Township, Kearney, Ontario.  An Emergency Director’s Order is issued when the MOECC is of the opinion that inaction of a situation can result in one or more of the following: danger to the health or safety of any person; harm or serious risk of harm to the environment; or injury or damage or serious risk of injury or damage to any property.

Under an Emergency Order, immediate actions and environmental actions must be taken to protect the natural environment and to prevent or reduce the discharge of a contaminant into the natural environment from the undertaking or property, or to prevent, decrease or eliminate an adverse effect.

Photo Credit: NorthBayNipissing.com

Kearney is a town and municipality in the Almaguin Highlands region of Parry Sound District of Ontario, Canada.  With a landmass of 531 square kilometres and a year-round population of 882 in the Canada 2016 Census, Kearney claims to be the “Biggest Little Town in Ontario.”  Butt Township was amalgamated with the Town of Kearney in 1979.

Since the issuance of Director’s Order Amendment No. 1 Ontario Graphite Limited (OGL) has reported to the MOECC multiple exceedances of discharge limits specified in the Environmental Compliance Approval (ECA) issued for the Kearney Mine industrial sewage works and Ontario Regulation 561/94 (i.e. including exceedance of limits for acute toxicity to test organisms Rainbow Trout and Daphnia magna, iron, total suspended solids and pH).

As requested by the MOECC, OGL proposed a short term management action plan to address the effluent discharge limit exceedances from the polishing pond until such time that construction can be completed on the industrial sewage works to enhance treatment efficiency once approved by the MOECC through an ECA amendment. OGL further indicated to the MOECC that an application to amend the ECA for necessary modifications to the industrial sewage works is currently being prepared.
Following the MOECC’s review of the short term management action plan and monitoring data submitted by OGL, the MOECC is concerned that measures proposed by OGL will be insufficient in achieving adequate treatment until such time that construction and operation of the proposed modification to the industrial sewage works, subject to the planned application and subsequent approval by the MOECC, if issued, are completed.

Currently, the lime dosing system being used at the Kearney Mine as part of the existing industrial sewage works operation is operated on a batch basis over, typically, an eight hour period during daylight hours.  The enhanced pH monitoring and reporting required by the January 31, 2018 Director’s Order amendment has demonstrated that the pH of the discharge is not consistently meeting the required pH range over a 24 hour period.  Therefore, the MOECC is directing that the operation of the batched system be extended over a daily, 24-hour period to ensure compliance with pH at all times.

In addition to adjusting the lime dosing system the MOECC is ordering a contingency plan be developed to including the use of an approved mobile treatment unit to ensure adequate treatment is achieved if proposed measures are not sufficient in achieving compliance with all discharge water quality limits until such time that modifications, approved through an amendment to the ECA, are implemented.

In summary the Emergency Director’s Order requires OGL to do the following:

  • Conduct an enhanced monitoring program for pH.
  • Ensure that the operation of lime dosing system is supervised by a Qualified Person and that effluent is maintained within a pH range of 6.5 – 8.5 at all times.
  • Retain a Qualified Person to develop and submit a contingency plan to treat the Kearney Mine polishing pond waters.
  • Retain a Qualified Person to submit an amendment to the issued Industrial Sewage Works, Environmental Compliance approval.

The Order was served to the company as well as a number of a company director, the CFO & CAO, and the CEO.